site survey

Relevé sur site.

Before serious bespoke work, the space, fixing points, lighting conditions, electrical options and installation routes should be assessed precisely.

site survey

Relevé sur site.

Before serious bespoke work, the space, fixing points, lighting conditions, electrical options and installation routes should be assessed precisely.

25.000 Ft+ ÁFA
Gross total: 31.750 Ft. The planning, fabrication and installation quote is prepared separately.

Available date